Broadway Subway is a 5.7 km extension of the Millennium Line to Arbutus.
Mostly: M-F, 830am-430pm
24/7: 1-844-815-6114
Collection Notice: https://t.co/hB5jlyZPPY

ID:1374120987973746694

linkhttps://www.broadwaysubway.ca/ calendar_today22-03-2021 22:09:25

726 Tweets

2,2K Followers

25 Following

The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

The TBMs are currently being disassembled at Arbutus Station. Here you can see Phyllis’ cutterhead being lifted onto the site for removal.

Want to see more of the disassembly work? Check out the mural with viewing windows on the north side of W. Broadway at Cypress St.

The TBMs are currently being disassembled at Arbutus Station. Here you can see Phyllis’ cutterhead being lifted onto the site for removal. Want to see more of the disassembly work? Check out the mural with viewing windows on the north side of W. Broadway at Cypress St.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

TBMs Phyllis and Elsie are being disassembled at the future Arbutus Station after completing their journeys.

On May 23, crews lifted Phyllis’ cutterhead out of the excavation at Cypress Street.

Can you spot the worker preparing the cutterhead for removal?

TBMs Phyllis and Elsie are being disassembled at the future Arbutus Station after completing their journeys. On May 23, crews lifted #TunnelBoringMachine Phyllis’ cutterhead out of the excavation at Cypress Street. Can you spot the worker preparing the cutterhead for removal?
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

In this shot, crews are installing track switches at the elevated guideway. This was the first section of SkyTrain track to be installed on the project.

Can you spot the SkyTrain tracks on the elevated guideway? (Hint: they’re brown.)

In this shot, crews are installing track switches at the elevated guideway. This was the first section of SkyTrain track to be installed on the project. Can you spot the SkyTrain tracks on the elevated guideway? (Hint: they’re brown.)
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Crews are constructing the concrete base to allow for track installation. The tracks will be installed on top of this final concrete layer.

Notice how the tracks will be slightly slanted to the left? This allows for a more comfortable ride as the SkyTrain rounds the corner.

Crews are constructing the concrete base to allow for track installation. The tracks will be installed on top of this final concrete layer. Notice how the tracks will be slightly slanted to the left? This allows for a more comfortable ride as the SkyTrain rounds the corner.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

In this shot, crews install rebar for the station walls at the future South Granville Station. 11 concrete columns have also been constructed on this level of the station.

To see more photos of the project, visit: ow.ly/7PIM50RYJA8

In this shot, crews install rebar for the station walls at the future South Granville Station. 11 concrete columns have also been constructed on this level of the station. To see more photos of the project, visit: ow.ly/7PIM50RYJA8
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

The roof is going up at GNW-Emily Carr Station. This is the first station roof to be constructed, out of the 6 stations.

This photo shows all 3 levels of the station: the platform level, the concourse level & preparations for the station roof underway in the background.

The roof is going up at GNW-Emily Carr Station. This is the first station roof to be constructed, out of the 6 stations. This photo shows all 3 levels of the station: the platform level, the concourse level & preparations for the station roof underway in the background.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

These track switches are the first sections of SkyTrain track to be installed on the Project.

They will allow trains to enter & exit a special third track in the middle of the elevated guideway, called a pocket track, which is used to store trains.

These track switches are the first sections of SkyTrain track to be installed on the Project. They will allow trains to enter & exit a special third track in the middle of the elevated guideway, called a pocket track, which is used to store trains.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Now that the tunnel boring machines have completed their journeys, crews are excavating connections between the two tunnels, called cross passages.

This one is between GNW-Emily Carr Station and Mount Pleasant Station, and crews have reached halfway to the other side.

Now that the tunnel boring machines have completed their journeys, crews are excavating connections between the two tunnels, called cross passages. This one is between GNW-Emily Carr Station and Mount Pleasant Station, and crews have reached halfway to the other side.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Did you know that each has more than 30 components to extract during the TBM disassembly process?

Here, a crane lifts a TBM part out of the excavated Arbutus Station site. The TBM parts will be taken away by truck for refurbishment or recycling.

Did you know that each #TunnelBoringMachine has more than 30 components to extract during the TBM disassembly process? Here, a crane lifts a TBM part out of the excavated Arbutus Station site. The TBM parts will be taken away by truck for refurbishment or recycling.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Have you seen the new mural at the Broadway-City Hall Station?

It features artwork submitted by the community answering the question “Where will the Broadway Subway Project take you?”

The artwork was created by children aged 12 and under during a submission period last year.

Have you seen the new mural at the Broadway-City Hall Station? It features artwork submitted by the community answering the question “Where will the Broadway Subway Project take you?” The artwork was created by children aged 12 and under during a submission period last year.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Each is now being dismantled at Cypress St. Here, a crane lifts a piece of TBM Phyllis out of the excavated Arbutus Station site.

Want to see more? Come have a look at this process through 2 viewing windows on the north side of W. Broadway at Cypress St.

Each #TunnelBoringMachine is now being dismantled at Cypress St. Here, a crane lifts a piece of TBM Phyllis out of the excavated Arbutus Station site. Want to see more? Come have a look at this process through 2 viewing windows on the north side of W. Broadway at Cypress St.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Crews are removing the TBM conveyor system, allowing station construction to proceed unobstructed by tunnelling work.

In this shot of GNW-Emily Carr from mid-April, TBM Phyllis’ conveyor system has already been dismantled, with TBM Elsie still en route to Cypress St.

Crews are removing the TBM conveyor system, allowing station construction to proceed unobstructed by tunnelling work. In this shot of GNW-Emily Carr from mid-April, TBM Phyllis’ conveyor system has already been dismantled, with TBM Elsie still en route to Cypress St.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

At South Granville Station, stairs are being constructed in the station entrance. Two escalators will be installed later, one on either side of the stairs.

Glass windows have already been installed at ground level - can you see how the light pours into the station entrance?

At South Granville Station, stairs are being constructed in the station entrance. Two escalators will be installed later, one on either side of the stairs. Glass windows have already been installed at ground level - can you see how the light pours into the station entrance?
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Can you spot the crew member in this photo?

In this shot of the future Mount Pleasant station, the concourse-level walls are being constructed for the station entrance building. The concourse level is located between ground level and the platform level.

Can you spot the crew member in this photo? In this shot of the future Mount Pleasant station, the concourse-level walls are being constructed for the station entrance building. The concourse level is located between ground level and the platform level.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

The installation of SkyTrain tracks is beginning at the elevated guideway!

In this shot, the crew use a mobile crane to unload a shipment of rails for the SkyTrain tracks. The first sections of track were lifted on top of the elevated guideway last week.

The installation of SkyTrain tracks is beginning at the elevated guideway! In this shot, the crew use a mobile crane to unload a shipment of rails for the SkyTrain tracks. The first sections of track were lifted on top of the elevated guideway last week.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Elsie has arrived at Arbutus Station!

Elsie’s breakthrough today looked very similar to TBM Phyllis’ arrival in late March, pictured here.

In this shot, you can see Phyllis’ cutterhead poking through and rubble collected inside the pressure chamber.

#TunnelBoringMachine Elsie has arrived at Arbutus Station! Elsie’s breakthrough today looked very similar to TBM Phyllis’ arrival in late March, pictured here. In this shot, you can see Phyllis’ cutterhead poking through and rubble collected inside the pressure chamber.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

At the future Arbutus Station, a worker inspects the blue and silver supports.

On top, the crew install a work platform to build the concourse level floor. Once the work platform is complete, the crew begin installing rebar before concrete is poured to complete the floor.

At the future Arbutus Station, a worker inspects the blue and silver supports. On top, the crew install a work platform to build the concourse level floor. Once the work platform is complete, the crew begin installing rebar before concrete is poured to complete the floor.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

This worker is preparing a column for a concrete pour. What you see now is the steel rebar inside the column that helps strengthen it – this will all be hidden once complete.

There are 11 columns just like this one on the platform level of the future South Granville Station.

This worker is preparing a column for a concrete pour. What you see now is the steel rebar inside the column that helps strengthen it – this will all be hidden once complete. There are 11 columns just like this one on the platform level of the future South Granville Station.
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Phyllis arrived at Cypress Street in late March, and crews are now removing the TBM support equipment.

Here is what Phyllis' conveyor belt looks like all spooled up at Great Northern Way-Emily Carr!

#TunnelBoringMachine Phyllis arrived at Cypress Street in late March, and crews are now removing the TBM support equipment. Here is what Phyllis' conveyor belt looks like all spooled up at Great Northern Way-Emily Carr!
account_circle
The Broadway Subway Project(@broadwaysubway_) 's Twitter Profile Photo

Here we can see the future Arbutus Station, where Elsie will be finishing her journey soon.

To find out more about the future Arbutus Station, visit our website:
ow.ly/MuPN50Rfsp8

Here we can see the future Arbutus Station, where #TunnelBoringMachine Elsie will be finishing her journey soon. To find out more about the future Arbutus Station, visit our website: ow.ly/MuPN50Rfsp8
account_circle