Doka (@doka_com) 's Twitter Profile
Doka

@doka_com

🏗️ Formwork & Scaffolding. We make it work.
👷 Follow and discover our journey!

ID: 308488043

linkhttp://www.doka.com calendar_today31-05-2011 14:06:15

341 Tweet

2,2K Followers

275 Following

Doka (@doka_com) 's Twitter Profile Photo

What's Krishan's favorite part about working at the new powder-coating line? Work facilitation and the possibility to get involved. ☑️ Become part of #TeamDoka too: doka.com/career #Doka #formwork #construction

What's Krishan's favorite part about working at the new powder-coating line? Work facilitation and the possibility to get involved. ☑️

Become part of #TeamDoka too: doka.com/career

#Doka #formwork #construction
Doka (@doka_com) 's Twitter Profile Photo

By spanning 250 metres, the Brunnholen Bridge is a key feature of the Sandnes bypass south of Stavanger, Norway. 😍🙌 We came up with a complete solution and teamed up with our experienced bridge-building partners ✅ bit.ly/3wjgk26 #Doka #formwork #construction

By spanning 250 metres, the Brunnholen Bridge is a key feature of the Sandnes bypass south of Stavanger, Norway. 😍🙌 We came up with a complete solution and teamed up with our experienced bridge-building partners ✅ bit.ly/3wjgk26

#Doka #formwork #construction
Doka (@doka_com) 's Twitter Profile Photo

We are proud to have made our contribution to the construction of the new IKEA store at #Vienna Westbahnhof. With this green flagship project, the urban IKEA is making a positive contribution to the microclimate and the environment. 🌿 📷: With courtesy from IKEA

We are proud to have made our contribution to the construction of the new <a href="/IKEA/">IKEA</a> store at #Vienna Westbahnhof. With this green flagship project, the urban IKEA is making a positive contribution to the microclimate and the environment. 🌿 

 📷: With courtesy from IKEA
Doka (@doka_com) 's Twitter Profile Photo

Bischoff Bau AG achieved a sensational construction time reduction of 30 days 👏 by using Doka’s #SmartFormworkSolutions. In the process, the amount of formwork required to produce the slab was reduced by half through the use of #Concremote: doka.com/concremote

Bischoff Bau AG achieved a sensational construction time reduction of 30 days 👏 by using Doka’s #SmartFormworkSolutions. In the process, the amount of formwork required to produce the slab was reduced by half through the use of #Concremote: doka.com/concremote
Doka (@doka_com) 's Twitter Profile Photo

Aftetal bridge in Bad Wünnenberg, Germany, is a true testimonal of amazing engineering. Almost 800 m long and made out of solid reinforced concrete, it is a true feast for the eyes. Come and take a look behind the scenes: doka.com/aftetal-bridge #TeamDoka #construction

Aftetal bridge in Bad Wünnenberg, Germany, is a true testimonal of amazing  engineering. Almost 800 m long and made out of solid reinforced concrete, it is a true feast for the eyes.

Come and take a look behind the scenes:
doka.com/aftetal-bridge

#TeamDoka #construction
Doka (@doka_com) 's Twitter Profile Photo

Challenging bridge project completed ahead of schedule: An insight into the Kutuctay bridge project in Peru. 🏗️ More about this bridge project under 👇: pulse.ly/bjxfckjvlm #Doka #Infrastructure #Bridge #Construction #CFT

Challenging bridge project completed ahead of schedule: An insight into the Kutuctay bridge project in Peru. 🏗️

More about this bridge project under 👇:
pulse.ly/bjxfckjvlm

#Doka #Infrastructure #Bridge #Construction #CFT
Doka (@doka_com) 's Twitter Profile Photo

We are thrilled to announce that Malaysian-based MFE is now part of Doka. By joining forces, we create the ultimate one-stop-shop for all formwork and scaffolding needs. Together, we are now a major single source for innovative solutions in the Asia Pacific region.

We are thrilled to announce that Malaysian-based MFE is now part of Doka. By joining forces, we create the ultimate one-stop-shop for all formwork and scaffolding needs. Together, we are now a major single source for innovative solutions in the Asia Pacific region.
Doka (@doka_com) 's Twitter Profile Photo

Doka is proud to announce the signing of an MoU with prestigious developer, Azizi Developments to supply formwork for the world's second tallest tower. To read the full article, click here ➡️ pulse.ly/r3c2eunwao #Doka #Azizi #Highrise #Formwork #Dubai #SecondTallestTower

Doka is proud to announce the signing of an MoU with prestigious developer, Azizi Developments to supply formwork for the world's second tallest tower.

To read the full article, click here ➡️  pulse.ly/r3c2eunwao

#Doka #Azizi #Highrise #Formwork #Dubai #SecondTallestTower
Doka (@doka_com) 's Twitter Profile Photo

Completion of four 3.2 million-gallon concrete digesters in only 2 months. The Solution used: Doka’s Slipform for the construction of the monolithic structure of the tanks. The Slipform rises automatically as the concrete sets and hardens. More here: pulse.ly/3lfawr1lop

Completion of four 3.2 million-gallon concrete digesters in only 2 months. The Solution used: Doka’s Slipform for the construction of the monolithic structure of the tanks. The Slipform rises automatically as the concrete sets and hardens.

More here: pulse.ly/3lfawr1lop
Doka (@doka_com) 's Twitter Profile Photo

When extending an 8-storey apartment in Munich, the complex slab and balcony plan called for a clever formwork solution. The HSG team summarised: DokaXdek + Framax Xlife plus = a great combination, when building in existing structures. More product info: pulse.ly/ilzydlqzvl

When extending an 8-storey apartment in Munich, the complex slab and balcony plan called for a clever formwork solution. The HSG team summarised: DokaXdek + Framax Xlife plus = a great combination, when building in existing structures.

More product info: pulse.ly/ilzydlqzvl
Doka (@doka_com) 's Twitter Profile Photo

On Hamburg's 4 km long highway bridge "K20", Strabag and Doka devised a new formwork concept: converting the ParaTop cantilever arm formwork into a mobile forming wagon that folds in and out in all four directions. More project details here: pulse.ly/htdiebel58

On Hamburg's 4 km long highway bridge "K20", Strabag and Doka devised a new formwork concept: converting the ParaTop cantilever arm formwork into a mobile forming wagon that folds in and out in all four directions.

More project details here: pulse.ly/htdiebel58
Doka (@doka_com) 's Twitter Profile Photo

Productivity boost in Detroit: The Super Climber SCP with integrated mini crane on the Hudson's Site Tower. 🚀🏗 More information here 👉: pulse.ly/tckeipwbvo #Doka #HudsonSiteTower #SuperClimberSCP #Highrise #Construction

Productivity boost in Detroit: The Super Climber SCP with integrated mini crane on the Hudson's Site Tower. 🚀🏗

More information here 👉: pulse.ly/tckeipwbvo

#Doka #HudsonSiteTower #SuperClimberSCP #Highrise #Construction
Doka (@doka_com) 's Twitter Profile Photo

The historic Post Rotterdam building is undergoing a transformation, being redeveloped with a 150-metre high-rise tower. Our SCP platform was used for the inner core and SKE50 plus for the outer part, including the shear walls. More here: pulse.ly/7ggzsbvbkt

The historic Post Rotterdam building is undergoing a transformation, being redeveloped with a 150-metre high-rise tower. Our SCP platform was used for the inner core and SKE50 plus for the outer part, including the shear walls.

More here: pulse.ly/7ggzsbvbkt
Doka (@doka_com) 's Twitter Profile Photo

Spotted at the high-rise project Post Rotterdam: With the Doka Protection Screen Xclimb 60 for increased safety on the construction of the new 150-metre high-rise tower! 🏙🏗 More about Post Rotterdam here 👉: pulse.ly/vv1z8crimy #Doka #HighRise #Safety #Construction

Spotted at the high-rise project Post Rotterdam: With the Doka Protection Screen Xclimb 60 for increased safety on the construction of the new 150-metre high-rise tower! 🏙🏗

More about Post Rotterdam here 👉: pulse.ly/vv1z8crimy

#Doka #HighRise #Safety #Construction
Doka (@doka_com) 's Twitter Profile Photo

Everything from a single source: Formwork, Scaffolding, and Digital Solutions for the Baltic's largest passenger terminal - Rail Baltica. It will connect the Baltic´s and Poland with an 870 km high-speed railway. More about the project on our website: pulse.ly/6xb0nzv8kc

Everything from a single source: Formwork, Scaffolding, and Digital Solutions for the Baltic's largest passenger terminal - Rail Baltica. It will connect the Baltic´s and Poland with an 870 km high-speed railway.

More about the project on our website:
pulse.ly/6xb0nzv8kc
Doka (@doka_com) 's Twitter Profile Photo

Rail Baltica will connect Estonia, Latvia, Lithuania, and Poland with an 870 km high-speed railway by 2030, including the expansion of Riga's main station into the Baltics' largest passenger hub. Doka supports with formwork and shoring solutions. #Doka #RailBaltica #Construction

Rail Baltica will connect Estonia, Latvia, Lithuania, and Poland with an 870 km high-speed railway by 2030, including the expansion of Riga's main station into the Baltics' largest passenger hub. Doka supports with formwork and shoring solutions.

#Doka #RailBaltica #Construction
Doka (@doka_com) 's Twitter Profile Photo

Saving time and money: Real-time concrete monitoring with Concremote at the Baltics' largest infrastructure project! Concremote uses sensors to measure the temperature and calculate the compressive strength of the concrete structure. #Doka #RailBaltica #Concremote #Construction

Saving time and money: Real-time concrete monitoring with Concremote at the Baltics' largest infrastructure project! Concremote uses sensors to measure the temperature and calculate the compressive strength of the concrete structure.

#Doka #RailBaltica #Concremote #Construction
Doka (@doka_com) 's Twitter Profile Photo

Safety at any height: Transforming Rotterdam's historic post office with the help of Doka's Protection Screen Xclimb 60. 🚀 #Doka #Xclimb60 #PostRotterdam #Construction #Safety

Safety at any height: Transforming Rotterdam's historic post office with the help of Doka's Protection Screen Xclimb 60. 🚀

#Doka #Xclimb60 #PostRotterdam #Construction #Safety
Doka (@doka_com) 's Twitter Profile Photo

New construction of the Thalaubachtal Bridge in Germany: Rapid construction progress with the incremental launching method. 🚧 doka.pulse.ly/6ukukj2ncj #Doka #Construction #Thalaubachtalbrücke #IncrementalLaunchingMethod

New construction of the Thalaubachtal Bridge in Germany: Rapid construction progress with the incremental launching method. 🚧
doka.pulse.ly/6ukukj2ncj

#Doka #Construction #Thalaubachtalbrücke #IncrementalLaunchingMethod