P C Mohan (@pcmohanmp) 's Twitter Profile
P C Mohan

@pcmohanmp

4th-term BJP LS MP for Bangalore Central | 2-time MLA Believer in the politics of development-oriented governance

ID: 2166444230

linkhttps://linktr.ee/pcmohan calendar_today31-10-2013 10:59:37

17,17K Tweet

105,105K Takipçi

2,2K Takip Edilen

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

PM Shri Narendra Modi Ji flags off the Madurai-Bengaluru Vande Bharat Express. Temple City Madurai is now directly connected to Bengaluru’s IT hub, facilitating easier travel for both pilgrims and professionals, and fostering economic and cultural ties between the two states.

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

At 5:30 PM today, I, along with MoS and Bengaluru North MP Shobha Karandlaje and Bengaluru South MP Tejasvi Surya, as a team, will travel on Namma Metro’s Purple Line from KR Pura to Majestic. We welcome your suggestions to improve Metro services. Join us on this journey.

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

BMRCL has opened a new entrance at Nadaprabhu Kempegowda Station Majestic for commuters transferring between the Green and Purple Lines.

BMRCL has opened a new entrance at Nadaprabhu Kempegowda Station Majestic for commuters transferring between the Green and Purple Lines.
P C Mohan (@pcmohanmp) 's Twitter Profile Photo

The Karnataka Government’s vanity Bengaluru tunnel road project raises serious questions: 1. Where is the ₹4.5 crore feasibility report by Altinok Consultants? 2. Has BMLTA reviewed this report as mandated? 3. Why is another ₹9.5 crore being spent on Rodic Consultants for

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

BBMP must urgently reassess its capabilities and approach to critical infrastructure projects. The recent Tunnel Road Request for Proposal (RFP) for the 9.5 crore DPR contract raises serious concerns: 1. The absence of a Drainage Engineer from the specified key team requirements

BBMP must urgently reassess its capabilities and approach to critical infrastructure projects. The recent Tunnel Road Request for Proposal (RFP) for the 9.5 crore DPR contract raises serious concerns:

1. The absence of a Drainage Engineer from the specified key team requirements
P C Mohan (@pcmohanmp) 's Twitter Profile Photo

The recent BBMP DPR bidding process for the proposed Rs 12,690 Crore, 18-km tunnel in Bengaluru raises serious concerns. 6 consultants attended the pre-bid meeting 4 consultants did not submit bids 2 consultants (Altinok and Rodic) submitted bids 1 consultant (Altinok) had their

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

The BBMP DPR tendering process, particularly the awarding of a Rs 9.4 crore contract to Rodic Consultants for the 18 km Bengaluru tunnel road DPR, raises serious questions: 1. Was Rodic Consultants banned by Dedicated Freight Corridor Corporation of India Limited (DFCCIL) at the

P C Mohan (@pcmohanmp) 's Twitter Profile Photo

Two Bengaluru suburban rail corridors, Benniganahalli to Chikkabanavara (25 km) and Heelalige to Rajanukunte (46.8 km), will be operational by Dec 2026.